Reference
Hochwuhr power station: Austria
Overview:
Hochwuhr power station
Hard concrete removal in the area of the two plunge pools by means of a special device in order to create space for the Hardox® plating, including the sub-structure. Depth of removal: 45 cm, slope of the weir ridge up to 95%.
Geographical position:
47.2329 9.5996
Links:
You can find similar projects in the following applications:
In this reference the following processes are used: